11/8/2020 0 Comments Nec Sl1100 User Guide
When you see the desired quantity on the screen, push redial once again to call the quantity.ROOM Keep track of Room monitor allows an extension pay attention to the sounds in co-workers region, for example, a receptionist could pay attention for sounds in the factory when its remaining unattended.Battery tray Body 2-20 Tugging out the Battery pack Holder Loosen two screws and remove the Battery pack tray cover.
NEC Company stores the right to change the specifications, features, or functions at any period without notice. When disposing of these electric batteries, KSU, andor Device, you must comply with applicable regulations relating to your location regarding correct disposal methods. In the event of tools breakdown, all repairs must end up being performed by an authorised seller of NEC. The Program and Terminals will not really function when the mains strength falters unless Battery Back-up ór a UPS is definitely connected. If emergency telephone use is required a Battery pack back-up or UPS desires to end up being connected. The SL1100 provides a maximum of 12 analogue trunks and 24 Multiline terminals, and furthermore equipped to support Digital Network (BRIPRI) and IP Trunks (SIP) or IP extensions. Stock Quantity Equipment Title Equipment Explanation Notice 8503498 SL1100 TDM Fundamental Kit SL1100 TDM Simple Package (For AT) IP4AT-1228M-N KSU, PZ-VM21, IP4WW-. Either the analogue trunk area daughter board (4COIDB) or the ISDN BRI daughter plank (2BRIDB) can become installed on this card. Service Overall tone receiver, DTMF receiver, Caller ID sender receiver, MF recipient, MFC receiver 2. Service Build sender, DTMF sénder, MF sénder, MFC sender 3.2 KSU Capability System picture of KSU capacity (ISDN, Trunk, Expansion) is usually proven as beneath. Avoid functioning with the Equipment during electrical storms. In places where drinking water or various other fluids comes in get in touch with with the apparatus. Sub-Cover Number 2-7 Removing the Sub-Covér The Sub-Covér can be opened and kept in the open up position. Force to hold Open Figure 2-8 Sub-Cover Open up Placement Align the four holes on the back again of thé KSU with thé four anchoring screws set up in the wall structure. The Sub-Cover must end up being opened in order to entry to it. Grounding the KSU Ensure Primary KSU are driven off and unplug the Air cooling cord. Do not really set up the Topaz Airport in the SL1100 program, it will not function properly. Trunk area Cabling Trunk area cabling is usually needed for the 4COIDB, 2BRIDB or 1PRIU PCBs. ESI 1-4 (J101), ESI 5-8 (L102): SLI 9-12DPH 1-2 (L103): Ana- 2-Cable Digital Expansion Interface logue Extension Port Connector Connection (RJ-61) (RJ-61) Capital t4 (Suggestion for slot 4). Sub-Cover Plastic material Knockouts Figure 2-15 Sub-Cover Replace the Sub-Cover. Do not really connect the DX2Y-32iNX7E Topaz Battery pack Package to the SL1100 system. Harm to tools or home may effect. Unpacking Unpack thé IP4WW-Battéry Box and examine it against the subsequent list. Two anchoring screws (with stopper) Front Cover up Figure 2-17 Removing the Front side Cover Disconnect the Battery power Connection Wire from the Fuse Unit if the wire is connected already. Batt Stopper Screw Figure 2-19 Batt Stopper Pull out the Electric battery tray.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |